Top Suppliers Auger Concrete Pump - Delivery Pipe – ANCHOR
Top Suppliers Auger Concrete Pump - Delivery Pipe – ANCHOR Detail:
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
It adheres to the tenet "Honest, industrious, enterprising, innovative" to develop new products constantly. It regards customers, success as its own success. Let us develop prosperous future hand in hand for Top Suppliers Auger Concrete Pump - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Bolivia, Istanbul, Stuttgart, Our company is an international supplier on this kind of merchandise. We offer an amazing selection of high-quality products. Our goal is to delight you with our distinctive collection of mindful products while providing value and excellent service. Our mission is simple: To provide the best products and service to our customers at the lowest prices possible.
By Julia from Barbados - 2018.12.14 15:26
The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
By Jean Ascher from Belize - 2018.06.03 10:17