Top Suppliers Auger Concrete Pump - Delivery Pipe – ANCHOR
Top Suppliers Auger Concrete Pump - Delivery Pipe – ANCHOR Detail:
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
The incredibly rich projects administration experiences and a person to 1 service model make the substantial importance of organization communication and our easy understanding of your expectations for Top Suppliers Auger Concrete Pump - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Afghanistan, Barbados, Holland, Our company absorbs new ideas, strict quality control, a full range of service tracking, and adhere to make high-quality products. Our business aims to "honest and trustworthy, favorable price, customer first", so we won the trust of the majority of customers! If you are interested in our products and services, please do not hesitate to contact us!
By Merry from California - 2017.10.23 10:29
We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
By Jodie from Orlando - 2017.08.21 14:13