OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking for the belief of "Creating items of top of the range and creating buddies with people today from all over the world", we normally put the interest of shoppers in the first place for Schwing Pump, Housing Ling, Screw Clamp, In our efforts, we already have many shops in China and our products have won praise from customers worldwide. Welcome new and old customers to contact us for the future long term business relationships.
OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR Detail:

The piston of the pump truck is in direct contact with concrete, it is required to be sealed and wear-resistant. When we find that the water in the tank is muddy or there is concrete, we should realize whether the piston is seriously worn, and we need to check the piston. If the piston is worn, it needs to be replaced in time to avoid straining the concrete cylinder.

When the coating (0.2-0.25mm) of the conveying cylinder is not worn, and concrete mud or sand appears on the back of the concrete piston, that is, the back of the water tank, it indicates that the piston is worn. The concrete seal, guide ring, and dust ring should be replaced immediately.

Since the piston can be returned to the water tank of the pumping system through a simple operation on the control panel, the piston should be removed frequently for inspection. In addition, after the piston is returned to the water tank, the concrete seal and guide ring on the piston should be cleaned and lubricated with lithium-based grease, which can effectively extend the service life of the piston.

Post-maintenance of the concrete piston of the concrete pump accessories

After replacing the new concrete piston, post-maintenance must be carried out

1. Frequently withdraw the piston of the concrete pump fittings, clean and apply lubricating oil;

2. It is found that there is mortar in the washing room, and the concrete piston of the concrete pump accessories should be replaced immediately;

3. Replace the cooling water frequently, clean the washing room and keep it clean;

4. Add enough cooling water, and add hydraulic oil for concrete pump parts as needed to improve lubrication.

Part number: P121618001
Model:DN230/DN200/DN180
Application: PM Truck/Vehicle Mounted Pump
                    PM Tailor Concrete Pump
                    PM Truck- Mounted Concrete Boom Pump
Packing Type

1.Economical and Practical
2.Imported Gabe Rubber materials
3.Extremely wear/heat/hydrolysis resistant, and strength of the        material is excellent


Product detail pictures:

OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR detail pictures


Related Product Guide:

Our business sticks for the basic principle of "Quality could be the life with the firm, and track record will be the soul of it" for OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR , The product will supply to all over the world, such as: United Kingdom, Nepal, Palestine, We confirm to public, cooperation, win-win situation as our principle, adhere to the philosophy of make a living by quality, keep developing by honesty , sincerely hope to build up a good relationship with more and more customers and friends, to achieve a win-win situation and common prosperity.
  • We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Salome from Denmark - 2018.11.22 12:28
    The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
    5 Stars By Natalie from Italy - 2017.03.08 14:45
    Write your message here and send it to us