OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Dedicated to strict high-quality management and considerate purchaser support, our experienced employees members are usually available to discuss your specifications and be certain full shopper satisfaction for Portable Concrete Pump, Chute Handle Mechanic, T Bend Pipe, Welcome your enquiry, best service will be provided with full heart.
OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR Detail:

The piston of the pump truck is in direct contact with concrete, it is required to be sealed and wear-resistant. When we find that the water in the tank is muddy or there is concrete, we should realize whether the piston is seriously worn, and we need to check the piston. If the piston is worn, it needs to be replaced in time to avoid straining the concrete cylinder.

When the coating (0.2-0.25mm) of the conveying cylinder is not worn, and concrete mud or sand appears on the back of the concrete piston, that is, the back of the water tank, it indicates that the piston is worn. The concrete seal, guide ring, and dust ring should be replaced immediately.

Since the piston can be returned to the water tank of the pumping system through a simple operation on the control panel, the piston should be removed frequently for inspection. In addition, after the piston is returned to the water tank, the concrete seal and guide ring on the piston should be cleaned and lubricated with lithium-based grease, which can effectively extend the service life of the piston.

Post-maintenance of the concrete piston of the concrete pump accessories

After replacing the new concrete piston, post-maintenance must be carried out

1. Frequently withdraw the piston of the concrete pump fittings, clean and apply lubricating oil;

2. It is found that there is mortar in the washing room, and the concrete piston of the concrete pump accessories should be replaced immediately;

3. Replace the cooling water frequently, clean the washing room and keep it clean;

4. Add enough cooling water, and add hydraulic oil for concrete pump parts as needed to improve lubrication.

Part number: P121618001
Model:DN230/DN200/DN180
Application: PM Truck/Vehicle Mounted Pump
                    PM Tailor Concrete Pump
                    PM Truck- Mounted Concrete Boom Pump
Packing Type

1.Economical and Practical
2.Imported Gabe Rubber materials
3.Extremely wear/heat/hydrolysis resistant, and strength of the        material is excellent


Product detail pictures:

OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR detail pictures


Related Product Guide:

Our corporation has been specializing in brand strategy. Customers' gratification is our greatest advertising. We also source OEM company for OEM China Switch Fork – Piston Ram Putzmeister – ANCHOR , The product will supply to all over the world, such as: Saudi Arabia, Kenya, Croatia, Our well-equipped facilities and excellent quality control throughout all stages of production enable us to guarantee total customer satisfaction. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact me. We are looking forward to forming successful business relationship with new clients around the world.
  • This company has a lot of ready-made options to choose and also could custom new program according to our demand, which is very nice to meet our needs.
    5 Stars By Kimberley from US - 2018.05.15 10:52
    It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
    5 Stars By Iris from Zimbabwe - 2017.03.28 16:34
    Write your message here and send it to us