Factory Outlets Hydraulic Concrete Pump With Pressure Gauge - Delivery Pipe – ANCHOR
Factory Outlets Hydraulic Concrete Pump With Pressure Gauge - Delivery Pipe – ANCHOR Detail:
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for Factory Outlets Hydraulic Concrete Pump With Pressure Gauge - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Tunisia, New Zealand, Moldova, Our products have won an excellent reputation at each of the related nations. Because the establishment of our firm. we have insisted on our production procedure innovation together with the most recent modern day managing method, attracting a sizable quantity of talents within this industry. We regard the solution good quality as our most vital essence character.
By Fay from Southampton - 2018.12.22 12:52
As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
By Natalie from Madrid - 2018.11.11 19:52