Chinese Professional Concrete Pump Coupling - Delivery Pipe – ANCHOR
Chinese Professional Concrete Pump Coupling - Delivery Pipe – ANCHOR Detail:
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:

Related Product Guide:
We've our have sales staff, style and design staff, technical crew, QC team and package workforce. We've strict excellent control procedures for each system. Also, all of our workers are experienced in printing field for Chinese Professional Concrete Pump Coupling - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Ethiopia, Birmingham, Mauritius, Customer satisfaction is our first goal. Our mission is to pursue the superlative quality, making continual progress. We sincerely welcome you to make progress hand in hand with us, and construct a prosperous future together.

The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
